Major Technological Demonstration Projects |
 |
China’s first imported 600MW
Supercritical coal-fired unit. |
|
Put into operation in Huaneng Shidongkou No.2 Power Plant in 1992. |
|
|
|
China’s first imported large-scale De-SOx
facility for coal-fired units. |
|
Put into operation in Huaneng Luohuang Power Plant in 1993. |
|
 |
 |
China’s first domestically-made 600MW Supercritical coal-fire Unit |
|
Put into operation in Huaneng Qinbei Power Plant in 2004, winning First Prize for China’s Power Science and Technology. |
|
|
|
China’s first domestically-made 1000MW Ultra Supercritical coal-fired unit |
|
Put into operation in Huaneng Yuhuan Power Plant in 2006, winning First Prize for National Science and Technology Advancement, Gold Award for National Environmentally-friendly Projects and Gold Award for National Excellent Projects. |
|
 |
 |
China’s first domestically-made 600MW Ultra Supercritical coal-fired unit |
|
Put into operation in Huaneng Yingkou Power Plant in 2007. |
|
|
|
China’s first domestically-made 350MW Supercritical coal-fired unit |
|
Put into operation in Huaneng Ruijin Power Plant in 2007. |
|
 |
 |
China’s first domestically-made 600MW direct air-cooled coal-fired unit |
|
Put into operation in Huaneng Tongchuan Power Plant in 2007. |
|
|
|
China’s first CO2 Capture facility for coal-fired units |
|
Put into operation in Huaneng Beijing Cogeneration Power Plant in 2008. The facility was designed and constructed by China Huaneng Group, and captures 3000 tons of CO2 per year. |
|
 |
 |
One of the world’s largest CO2 Capture facility for coal-fired units |
|
Put into operation in Huaneng Shanghai Shidongkou No.2 Power Plant in 2009. The facility captures 120,000 tons of CO2 per year. |
|
|
|
Hydropower project with the world’s highest Hyperbolic Arch Dam (294.5m) |
|
Put into operation in Huaneng Xiaowan Hydropower Station in 2009. |
|
 |
 |
China’s largest single-capacity coal-fired unit (1036MW) |
|
Put into operation in Huaneng Haimen Power Plant in 2009, winning Gold Award for National Excellent Projects. |
|
|
|
China’s first domestically-made 660MW Supercritical Tower-type Lignite Boiler generating unit |
|
Put into operation in Huaneng Jiutai Power Plant in 2009. |
|
 |
 |
China’s first IGCC Demonstration Power Project (250MW) |
|
Put into operation in Huaneng Tianjin Gasification Co., Ltd. in 2012. |
|
|
|
Hydropower project with Asia’s highest Clay Core-wall Rockfill Dam (261.5m) |
|
The first unit of the project was put into operation in Huaneng Nuozhadu Hydropower Station in 2012, winning Second Prize for National Science and Technology Advancement. |
|
 |
 |
The world’s first High Temperature Gas-cooled Reactor nuclear power project |
|
Started construction in Huaneng Shidaowan Nuclear Power Plant. The project has an installed capacity of 200MW, and is scheduled to be operational by 2017. |
|
|
|
China’s first Fresnel Concentrated Solar Power (CSP) facility |
|
Put into operation in Huaneng Hainan Sanya Nanshan Power Plant in 2012. |
|
 |
|
|